This test is best carried out during the construction phase, the test will identify the extent of the air leakage of the building, a blower door is fitted over an exterior door opening and the speed of air-flow through the fan is measured, following remedial works as much 30-40% can be saved on energy consumption with a comparable reduction in CO2 emissions.
